Accounting for drivers' bicycling frequency and familiarity with bicycle infrastructure treatments when evaluating

Nicholas Fournier1, Sarah Bakhtiari2, Krishna Deep Valluru2

  • 1University of California, Berkeley, McLaughlin Hall, Berkeley, CA 94720, USA.

Related Concept Videos

Determination of Expected Frequency01:08

Determination of Expected Frequency

Suppose one wants to test independence between the two variables of a contingency table. The values in the table constitute the observed frequencies of the dataset. But how does one determine the expected frequency of the dataset? One of the important assumptions is that the two variables are independent, which means the variables do not influence each other. For independent variables, the statistical probability of any event involving both variables is calculated by multiplying the individual...
2.5K
Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
335
The Availability Heuristic01:08

The Availability Heuristic

A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
6.8K
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
268
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
484
Hypothesis Test for Test of Independence01:16

Hypothesis Test for Test of Independence

The test of independence is a chi-square-based test used to determine whether two variables or factors are independent or dependent. This hypothesis test is used to examine the independence of the variables. One can construct two qualitative survey questions or experiments based on the variables in a contingency table. The goal is to see if the two variables are unrelated (independent) or related (dependent). The null and alternative hypotheses for this test are:
H0: The two variables (factors)...
7.2K