Tracking reduction of water lead levels in two homes during the Flint Federal Emergency
Anurag Mantha1, Min Tang1, Kelsey J Pieper1
1Virginia Tech, Charles E. Via, Jr. Department of Civil and Environmental Engineering, 1145 Perry St., 418 Durham Hall, Blacksburg, VA, 24061, United States.
Abstract:
A Federal Emergency was declared in Flint, MI, on January 16, 2016, 18-months after a switch to Flint River source water without phosphate corrosion control. Remedial actions to resolve the corresponding lead in water crisis included reconnection to the original Lake Huron source water with orthophosphate, implementing enhanced corrosion control by dosing extra orthophosphate, a "Flush for Flint" program to help clean out loose leaded sediment from service lines and premise plumbing, and eventually lead service line replacement. Independent sampling over a period of 37 months (January 2016-February 2019) was conducted by the United States Environmental Protection Agency and Virginia Tech to evaluate possible human exposure via normal flow (∼2-3 L/min) sampling at the cold kitchen tap, and to examine the status of loose deposits from the service line and the premise plumbing via high-velocity flushing (∼12-13 L/min) from the hose bib. The sampling results indicated that high lead in water persisted for more than a year in two Flint homes due to a large reservoir of lead deposits. The effects of a large reservoir of loose lead deposits persisted until the lead service line was completely removed in these two anomalous homes. As water conservation efforts are implemented in many areas of the country, problems with mobile lead reservoirs in service lines are likely to pose a human health risk.
More Related Videos
08:49Vegetated Treatment Systems for Removing Contaminants Associated with Surface Water Toxicity in Agriculture and Urban Runoff
Published on: May 15, 2017
09:23Removal of Trace Elements by Cupric Oxide Nanoparticles from Uranium In Situ Recovery Bleed Water and Its Effect on Cell Viability
Published on: June 21, 2015
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Efflorescence in Masonry
While initial efflorescence is common post-construction and can be cleaned with water and a brush, in certain instances, efflorescence can reappear and gradually diminish over time as salts are leached out...
Precipitation and Co-precipitation
Quality of Water
