Quantifying the relationship between predisaster mitigation spending and major disaster declarations for US states

Katharina Renken1, Andrea M Jackman2, Mario G Beruvides3

  • 1Senior Researcher, Professor, Kühne Logistics University GmbH, Hamburg, Germany.

Summary

Despite the Disaster Mitigation Act of 2000 (DMA 2000) aiming to reduce major disaster declarations, analysis shows an increasing trend. This study explores the impact of federal policy on local disaster prevention efforts.

Related Concept Videos

Applications of GIS: Disaster Management and Emergency Response01:29

Applications of GIS: Disaster Management and Emergency Response

Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
333
Diagnostic and Statistical Manual of Mental Disorders (DSM)01:27

Diagnostic and Statistical Manual of Mental Disorders (DSM)

The Diagnostic and Statistical Manual of Mental Disorders (DSM) serves as the primary classification system for mental health disorders, providing standardized diagnostic criteria for clinicians and researchers. First published by the American Psychiatric Association (APA) in 1952, the DSM has undergone several revisions to reflect evolving psychiatric understanding. The fifth edition, DSM-5, released in 2013, introduced key updates that expanded diagnostic categories and modified diagnostic...
651
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
220
Manipulation and Analysis01:21

Manipulation and Analysis

GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
209
Distribution Reliability and Automation01:25

Distribution Reliability and Automation

Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
422
Ratio Level of Measurement00:54

Ratio Level of Measurement

The way a set of data is measured is called its level of measurement. Correct statistical procedures depend on a researcher being familiar with levels of measurement. For analysis, data are classified into four levels of measurement—nominal, ordinal, interval, and ratio.
A set of data measured using the ratio scale takes care of the ratio problem and provides complete information. Ratio scale data are like interval scale data, except they have a zero point and ratios can be calculated....
20.4K