Related Experiment Video
Updated: Jul 23, 2026

Collecting Sleep, Circadian, Fatigue, and Performance Data in Complex Operational Environments
Published on: August 8, 2019
Working time limits at sea, a hundred-year construction
1World Maritime University, Malmo, Sweden.
Abstract:
In a view to protect workers from extended work periods as well as to comply with the Versailles Peace Treaty requirements, the International Labour Organization (ILO) regulated hours of work from 1919 using '8-hour workday and 48-h workweek' as yardsticks. However, a historical perspective demonstrates the ILO's difficulties in integrating such standards for sea workers. From 1920 to 1958, the ILO endeavoured to anchor the 8-hour workday principle in maritime conventions on working time and to ensure compliance by quantifying manning levels. Facing sectoral opposition and the obstacle of the minimum tonnage requirement, none of the conventions adopted during the first period entered into force. A second regulatory wave (1995-2007) initiated by the International Maritime Organization (IMO) orientated working time towards fatigue management and adopted the 14-hour workday. Absorbed by the ILO from 1996, this threshold facilitated the implementation of working time standards for sea workers. The existence of autonomous maritime governance at the ILO and the IMO complemented by the incorporation of the tonnage clause in maritime convention allowed the acceptance of the 14-hour workday system in spite of breaching the universal principles established a century ago. The departure between maritime and land standards show that sectoral interests prevail over labour rights. More decisively, current standards detached labour rights from workers' human nature and attached them directly to sectoral interests.
More Related Videos
14:06Rapid Testing of Resistance of Timber to Biodegradation by Marine Wood-Boring Crustaceans
Published on: January 29, 2022
06:22The Floating Lab: Standard Operational Procedure for Collecting and Filtering Seawater Samples from Operating Ferries for Environmental DNA Analysis
Published on: August 1, 2025
Related Concept Videos
Setting Time of Cement
Testing Water Quality
Mixing Time
Effect of Sea Water on Concrete
Concrete in areas between tide marks, which undergo...
Design Example: Managing Concrete Workability
To address...
Survey Safety