Real-Time Estimation of the Short-Run Impact of COVID-19 on Economic Activity Using Electricity Market Data

Carlo Fezzi1,2, Valeria Fanghella1

  • 1Department of Economics and Management, University of Trento, Via Vigilio Inama 5, 38122 Trento, Italy.

Environmental & Resource Economics
|August 25, 2020
PubMed

Related Concept Videos

Power System Three-Phase Short Circuits01:21

Power System Three-Phase Short Circuits

Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
435
Econometric Views (EViews)01:29

Econometric Views (EViews)

Econometric Views, often stylized as EViews, is a package that merges statistical analysis with econometric studies. It is designed to provide tools for time series analysis, forecasting, and econometric model simulation. The software originated from MicroTSP software and has evolved significantly since its inception in 1981. The history of EViews is marked by a continuous effort to enhance its computational speed and user interface. It was initially developed for large computing systems but...
420
Steps in Outbreak Investigation01:18

Steps in Outbreak Investigation

In the ever-evolving field of public health, statistical analysis serves as a cornerstone for understanding and managing disease outbreaks. By leveraging various statistical tools, health professionals can predict potential outbreaks, analyze ongoing situations, and devise effective responses to mitigate impact. For that to happen, there are a few possible stages of the analysis:
401
Electrical Power01:07

Electrical Power

Electric power is the product of current and voltage, represented in units of joules per second, or watts. For example, cars often have one or more auxiliary power outlets with which you can charge a cell phone or other electronic devices. These outlets may be rated at 20 amps and 12 volts, so that the circuit can deliver a maximum power of 240 watts. Consider a 25 Watt bulb and a 60 Watt bulb. The conversion of electrical energy produces heat and light, while the kinetic energy lost by the...
3.5K
Three-Phase Short Circuit—Unloaded Synchronous Machine01:21

Three-Phase Short Circuit—Unloaded Synchronous Machine

Conducting a three-phase short circuit test on an unloaded synchronous machine helps understand its impact on the system. The AC fault current's oscillogram, with the DC offset removed, reveals that the waveform amplitude decreases from an initially high value to a steady-state level for one phase of the machine.
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
550
Bus Impedance Matrix01:24

Bus Impedance Matrix

Calculating subtransient fault currents for three-phase faults in an N-bus power system involves using the positive-sequence network. When a three-phase short circuit occurs at a specific bus, the analysis uses the superposition method to evaluate two separate circuits.
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
414