Related Experiment Video
Updated: Aug 5, 2026

Continuously-stirred Anaerobic Digester to Convert Organic Wastes into Biogas: System Setup and Basic Operation
Published on: July 13, 2012
Pushing the limits of solids retention time for enhanced biological phosphorus removal: process characteristics and
Paul Roots1, Alex Rosenthal1, Yubo Wang1
1Department of Civil and Environmental Engineering, Northwestern University, 2145 Sheridan Road, Evanston, IL, 60208, USA
Abstract:
Reducing the solids retention time (SRT) of the enhanced biological phosphorus removal (EBPR) process can increase organic carbon diversion to the sidestream for energy recovery, thereby realizing some of the benefits of the high rate activated sludge (HRAS) process. Determining the washout (i.e. minimum) SRT of polyphosphate accumulating organisms (PAOs), therefore, allows for simultaneous phosphorus and carbon diversion for energy recovery from EBPR systems. However, few studies have investigated the washout SRT of PAOs in real wastewater, and little is known of the diversity of PAOs in high rate EBPR systems. Here we demonstrate efficient phosphorus removal (83% orthophosphate removal) in a high rate EBPR sequencing batch reactor fed real primary effluent and operated at 20 °C. Stable operation was achieved at a total SRT of 1.8 ± 0.2 days and hydraulic retention time of 3.7-4.8 hours. 16S rRNA gene sequencing data demonstrated that Accumulibacter were the dominant PAO throughout the study, with a washout aerobic SRT between 0.8 and 1.4 days. qPCR targeting the polyphosphate kinase gene revealed that Accumulibacter clades IIA, IIB and IID dominated the PAO community at low SRT operation, while clade IA was washed out at the lowest SRT values.
Related Concept Videos
Microbial Bioremediation of Uranium
Microbial Wastewater Treatment
Bioreactor Design and Operational System
Bioplastics
Biological Treatment of Effluent and Waste Water

