Prioritizing the indicators influencing permit to work system efficiency based on an analytic network process
Soheil Abbasi1, Neda Gilani2, Mostafa Javanmardi3
1Department of Environmental Health Engineering, Tabriz University of Medical Sciences, Iran.
Abstract:
A permit to work (PTW) system is a formal procedure designed to control non-routine and hazardous works. However, this system by itself does not prevent incidents, and various factors contribute to its efficiency. This study aims to prioritize the indicators influencing system efficiency. To do this, indicators of the system were identified and scored by 15 safety experts. Next, priority weights of the indicators were analyzed by an analytic network process and Super Decisions version windows 2.10. Accordingly, the nine main indicators and 43 sub-indicators influencing the PTW system were ranked. The main indicators from high to low were preventive actions, training, safe procedures, emergency system, control and corrective measures, coordination, monitoring, details of the permit form and documentation, respectively. The present work helps identify the involved indicators in PTW system efficiency. Thereby, the experts can prioritize and perform measures to prevent failures in the system and decrease accidents.
More Related Videos
Related Concept Videos
Introduction to Statistical Process Control
Distribution Reliability and Automation
The Availability Heuristic
Pilot and Numeric Relaying
Run Charts