A conjunctive management framework for the optimal design of pumping and injection strategies to mitigate seawater intrusion
Related Experiment Video
Updated: Nov 20, 2025

A Modeling and Simulation Method for Preliminary Design of an Electro-Variable Displacement Pump
Published on: June 1, 2022
Yun Yang1, Jian Song2, Craig T Simmons3
1School of Earth Sciences and Engineering, Hohai University, Nanjing, China.
Abstract:
Coastal aquifer management (CAM) considering conjunctive optimization of pumping and injection system for seawater intrusion (SI) mitigation poses significant decision-making challenges. CAM needs to pose multiple objectives and massive decision variables to explore tradeoff strategies between the conflicting resources, economic, and environmental requirements. Here, we investigate a joint artificial injection scheme for ameliorating SI by establishing an evolutionary multi-objective decision-making framework that combines simulation-optimization (S-O) modelling with a cost-benefit analysis, and demonstrate the framework on a large-scale CAM case in Baldwin County, Alabama. First, a SI numerical model, using SEAWAT, was configured to predict the vulnerable region as an SI encroachment area with the scenarios of minimum and maximum pumping capacity. As a result, a smaller number of candidate sites were selected in the SI encroachment area for implementing groundwater injection to avoid the computationally infeasible SI optimization with an inordinate number of injection related decision variables. Second, the effective S-O methodology of niched Pareto tabu search combined with a genetic algorithm (NPTSGA), which considers the moving-well option, was applied to discover optimal pumping/injection (P/I) strategies (including P/I rates and injection well locations) between three conflicting management objectives under complicated SI constraints. Third, for practical operation of the P/I schemes, a cost-benefit analysis provides judgment criteria to allow decision-makers to implement more sustainable P/I strategies to capture the different realistic preferences. The implementation of three extreme optimization solutions for the case study indicates that, compared to the initial unoptimized scheme, a maximum increase of a factor of 3 in groundwater extraction rates, a maximum reduction of 17% in extent of SI, and a maximum 82.3 million US dollars in comprehensive benefits are specifically achieved by conjunctive P/I optimization. The robustness in the decision alternatives attributed to the uncertainty in physical parameters of hydraulic conductivity was discovered through global sensitivity analysis. The proposed framework provides a decision support system for multi-objective CAM with combined pumping control and engineering measures for SI mitigation.
Related Concept Videos
Multiple Pipe Systems
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
Design Example: Design of an Irrigation Channel
Regulation of Water Output
Design Example: Creating a Hydraulic Model of a Dam Spillway
Design Example: Designing a Residential Plumbing System
Pumped Concrete
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...

