Analysis of patient-specific quality assurance for Elekta Unity adaptive plans using statistical process control

Sarah Strand1, Amanda Boczkowski1, Blake Smith1

  • 1University of Iowa Hospitals and Clinics, Iowa City, IA, USA.

Summary

Elekta Unity MR-linac adaptive plans, including adapt to position (ATP) and adapt to shape (ATS), passed TG-218 guidelines. ATS and SBRT plans showed slightly lower gamma pass rates, with aperture area correlating to plan complexity.

Related Concept Videos

Introduction to Statistical Process Control01:15

Introduction to Statistical Process Control

Statistical Process Control (SPC) is a method used to monitor and control quality within processes, particularly in manufacturing and service delivery, by employing statistical methods. SPC aims to distinguish between natural (common cause) variation and variation due to specific changes or events (special cause), allowing for timely improvements and sustained quality. The control chart, a pivotal tool in SPC, visually displays data over time alongside a central line of upper and lower control...
413
Quality Control01:05

Quality Control

Quality control is one of the three cyclical quality assurance activities that help keep a system under statistical control. Typical quality control activities include creating quality control charts, conducting proficiency testing, and documenting and archiving results.
Quality control helps track data, visualize trends, and identify variations, making it easier to detect deviations that may affect the accuracy of an analysis. One way to do this is by generating a quality control chart, which...
780
Quality Assurance01:19

Quality Assurance

Quality assurance is the overarching term used to describe the activities employed to ensure the proper performance of a system. These activities can be classified into three categories: quality control, quality assessment, and internal corrective measures. Typically, these activities work cyclically: quality control is performed before and during the analysis, while quality assessment occurs during and after the investigation. Internal corrective measures are implemented based on the findings...
586