Quantifying the benefits of in-time and in-place responses to remediate acute LNAPL release incidents
Related Experiment Video
Updated: Nov 11, 2025

Optimized Management of Endovascular Treatment for Acute Ischemic Stroke
Published on: January 18, 2018
Kaveh Sookhak Lari1, Andrew King2, John L Rayner3
1CSIRO Land and Water, Private Bag No. 5, Wembley, WA, 6913, Australia; School of Engineering, Edith Cowan University, 270 Joondalup Drive, Joondalup, WA, 6027, Australia.
Abstract:
Acute large volume spills from storage tanks of petroleum hydrocarbons as light non aqueous phase liquids (LNAPLs) can contaminate soil and groundwater and may have the potential to pose explosive and other risks. In consideration of an acute LNAPL release scenario, we explore the value of a rapid remediation response, and the value of installing remediation infrastructure in close proximity to the spill location, in effecting greater recovery of LNAPL mass from the subsurface. For the first time, a verified three-dimensional multi-phase numerical framework and supercomputing resources was applied to explore the significance of in-time and in-place remediation actions. A sand aquifer, two release volumes and a low viscosity LNAPL were considered in key scenarios. The time of commencement of LNAPL remediation activities and the location of recovery wells were assessed requiring asymmetric computational considerations. The volume of LNAPL released considerably affected the depth of LNAPL penetration below the groundwater table, the radius of the plume over time and the recoverable LNAPL mass. The remediation efficiency was almost linearly correlated with the commencement time, but was a non-linear function of the distance of an extraction well from the spill release point. The ratio of the recovered LNAPL in a well located at the centre of the spill/release compared to a well located 5 m away was more than 3.5, for recovery starting only 7 days after the release. Early commencement of remediation with a recovery well located at the centre of the plume was estimated to recover 190 times more LNAPL mass than a one-month delayed commencement through a well 15 m away from the centre of the LNAPL plume. Optimally, nearly 40% of the initially released LNAPL could be recovered within two months of commencing LNAPL recovery actions.
More Related Videos
09:18Laser-heating and Radiance Spectrometry for the Study of Nuclear Materials in Conditions Simulating a Nuclear Power Plant Accident
Published on: December 14, 2017
05:26Postconditioning with Lactate-enriched Blood for Cardioprotection in ST-segment Elevation Myocardial Infarction
Published on: May 28, 2019
Related Concept Videos
Applications of GIS: Disaster Management and Emergency Response
Steps in Outbreak Investigation
Prevention of Further Absorption of Poison
Acute Coronary Syndrome IV: Interprofessional Care
Reclosers and Fuses
A comprehensive protection scheme for radial distribution...
Cardiopulmonary Resuscitation IV: Pharmacological Management