Related Experiment Video
Updated: Nov 10, 2025

Installation Method to Enhance Quality Control for Fiber Reinforced Polymer Spike Anchors
Published on: April 10, 2018
Indirect Determination of Residual Prestressing Force in Post-Tensioned Concrete Beam
Jakub Kraľovanec1, Martin Moravčík1, Petra Bujňáková1
1Department of Structures and Bridges, Faculty of Civil Engineering, University of Žilina, Univerzitná 8215/1, 01026 Žilina, Slovakia.
Abstract:
A diagnostic survey on the precast prestressed bridge Nižná confirmed significant deterioration due to environmental distress. Evidently, decisive failures of the structure have a similar character as in the previous precast prestressed bridge in Podbiel in the northern part of Slovakia. These failures result from the unsuitable concept of the first generation of precast prestressed concrete beams, which was used in the former Czechoslovakia in the second half of the 20th century. Subsequently, experimental verification using the proof-load test was also executed. This bridge was built in 1956, so at the time of testing, it was 60 years old. The paper presents the indirect determination of prestressing level in one precast post-tensioned concrete beam using the saw-cut method. Experimental measurement was executed during the bridge demolition. Subsequently, a 2D numerical model in ATENA 2D Software, with the assumption of nonlinear material behavior for verification of experimental results, was performed. Finally, the residual prestressing force was evaluated and compared with the expected state of prestressing according to Eurocodes after 60 years of service.
Related Concept Videos
Prestressed Concrete
Internal Loadings in Structural Members: Problem Solving
To illustrate this, let's consider a beam OC of 5 kN, inclined at an angle of 53.13° with the horizontal and supported at both ends. Determine the internal...
Tensile Strength Considerations of Concrete
The dimensions and shape of a concrete specimen...
Dynamic Modulus of Elasticity of Concrete
The sonic test is a common method to determine the dynamic modulus. In this test, a concrete beam, sized either 6 x 6 x 30 inches or 4 x 4 x 20 inches, is clamped at its center. Vibrations are initiated at one end of the beam by an electromagnetic exciter unit powered by a...
Shearing Stresses in a Beam: Problem Solving
Prismatic Beams: Problem Solving
The design begins with analyzing the beam as a free body to identify moments and force balances, thereby determining support reactions. Next, the...

