Related Experiment Video
Updated: Nov 4, 2025

Evaluating the Effect of Roadside Parking on a Dual-Direction Urban Street
Published on: January 20, 2023
[Landscape pattern of built-up land in a typical mining city, Datong, Shanxi, China from 1986 to 2018.]
Han Ya-Hui1, Wen-Bin Sun1, Ying Fu1
1School of Earth Science and Surveying and Mapping Engineering, China University of Mining and Technology (Beijing), Beijing 100083, China.
Abstract:
Analyzing the landscape spatial layout and evolution characteristics of built-up land in a mining city is helpful to solve the environment problem, and can provide scientific basis for optimizing the urban land structure and taking timely intervention measures for transformation. Taking Datong, a typical mining city as the case, we examined the spatiotemporal characteristics of landscape of built-up land based on the spatial distribution data of built-up land from 1986 to 2018 with the landscape index analysis method, and detected the landscape change period with graphs obtained by Fourier transform and wavelet transform. The results showed that, during the study period, the area of built-up land in Datong City increased continually, with the growth rate gradually slowing down and the extent spreading from a "northeast-southwest" belt zone to the east. The fragmentation and complexity of the landscape pattern were increasing. The physical connectivity gradually decreased, while functional connectivity alternated between high and low values. The space expansion of Datong City and the fragmentation and complication of landscape pattern of its built-up land may all have a cycle of about 35 years, while the functional connectivity had a longer cycle than the physical connectivity.
More Related Videos
11:41Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation
Published on: February 1, 2020
08:09Measuring and Mapping Patterns of Soil Erosion and Deposition Related to Soil Carbonate Concentrations Under Agricultural Management
Published on: September 12, 2017
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Topographic Surveying and Contours
Thematic Layering in GIS
Design Example: Maintaining Level of an Embankment
Plotting of Topographic Maps
Methods of Obtaining Topography