Related Experiment Video
Updated: Nov 3, 2025

Development of an Individual-Tree Basal Area Increment Model using a Linear Mixed-Effects Approach
Published on: July 3, 2020
Comparing the Ability of Regression Modeling and Bayesian Additive Regression Trees to Predict Costs in a Responsive
James Wagner1, Brady T West1, Michael R Elliott1
1University of Michigan, 4053 ISR, 426 Thompson St., Ann Arbor, MI 48104, U.S.A.
Abstract:
Responsive survey designs rely upon incoming data from the field data collection to optimize cost and quality tradeoffs. In order to make these decisions in real-time, survey managers rely upon monitoring tools that generate proxy indicators for cost and quality. There is a developing literature on proxy indicators for the risk of nonresponse bias. However, there is very little research on proxy indicators for costs and almost none aimed at predicting costs under alternative design strategies. Predictions of survey costs and proxy error indicators can be used to optimize survey designs in real time. Using data from the National Survey of Family Growth, we evaluate alternative modeling strategies aimed at predicting survey costs (specifically, interviewer hours). The models include multilevel regression (with random interviewer effects) and Bayesian Additive Regression Trees (BART).
More Related Videos
12:26Integrating Remote Sensing with Species Distribution Models; Mapping Tamarisk Invasions Using the Software for Assisted Habitat Modeling SAHM
Published on: October 11, 2016
12:18A Machine Learning Approach to Design an Efficient Selective Screening of Mild Cognitive Impairment
Published on: January 11, 2020
Related Concept Videos
Survival Tree
Building a Survival Tree
Constructing a...
Multiple Regression
Farmers can use multiple regression to determine the crop yield based on more than one factor, such as water availability, fertilizer, soil properties, etc. Here, the crop yield is the response or dependent variable as it depends on the other independent variables. The analysis requires the construction of a scatter plot...
Regression Analysis
In regression analysis, a regression equation is determined based on the line of best fit– a line that best fits the data points plotted in a graph. This line is also called the regression line. The algebraic equation for the regression line is called the regression equation. It is represented as:
Residuals and Least-Squares Property
If the observed data point lies above the line, the residual is positive, and the line underestimates the actual data value for y. If the observed data point lies below the line, the residual is negative, and the line overestimates the actual data value for y.
The process of fitting the best-fit...
Comparing the Survival Analysis of Two or More Groups
Response Surface Methodology
The process of RSM involves several key steps: