Related Experiment Video
Updated: Oct 31, 2025

Expression of Cementitious Pore Solution and the Analysis of Its Chemical Composition and Resistivity Using X-ray Fluorescence
Published on: September 23, 2018
Blown away: Citicorp Center Tower repairs revisited
1National Institute of Standards and Technology, Gaithersburg, Maryland 20899-8611.
None:
Using Database-Assisted Design and the Tokyo Polytechnic University Aerodynamic Database, we show that face winds put more structural demand than corner winds do on the Citicorp Tower in Manhattan. This 59-story building, supported by four midside columns, famously had to undergo secret emergency strengthening shortly after its completion in the 1970s to withstand corner winds.
More Related Videos
10:00Experimental Protocol to Determine the Chloride Threshold Value for Corrosion in Samples Taken from Reinforced Concrete Structures
Published on: August 31, 2017
10:24Applicability Analysis of Assessment Methods for Morphological Parameters of Corroded Steel Bars
Published on: November 1, 2018
Related Concept Videos
Reinforced Brick Masonry
To fortify brick walls...
Microcracking in Concrete
Center of Gravity
To determine its location, the principle of moments can be utilized by dividing the object into...
Internal Loadings in Structural Members: Problem Solving
To illustrate this, let's consider a beam OC of 5 kN, inclined at an angle of 53.13° with the horizontal and supported at both ends. Determine the internal...
Prestressed Concrete
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...