Related Experiment Video
Updated: Oct 17, 2025

Modifying the Bank Erosion Hazard Index BEHI Protocol for Rapid Assessment of Streambank Erosion in Northeastern Ohio
Published on: February 13, 2015
Full-stream erosion in the lower Yellow River: Feasibility, sustainability and opportunity
Dongxian Kong1, Chiyuan Miao2, Junhua Li3
1College of Geodesy and Geomatics, Shandong University of Science and Technology, Qingdao 266590, China; State Key Laboratory of Earth Surface Processes and Resource Ecology, Faculty of Geographical Science, Beijing Normal University, Beijing 100875, China.
Abstract:
The issue of how to achieve removal of recently accumulated sediment is one of the largest unresolved puzzles in China's lower Yellow River. In this work, the feasibility and sustainability of achieving full-stream erosion in the lower Yellow River based on a water-sediment regulation scheme (WSRS) have been comprehensively investigated. The results indicate that the erosion-deposition state of the lower Yellow River is controlled by the incoming flow discharge level and the corresponding sediment concentration. The year 1987 is identified as an abrupt change point for streamflow in Xiaolangdi station. The relationships between channel erosion or deposition and the sediment concentration of the incoming discharge are constructed for the periods 1960-1987 and 1988-2017. Based on a constrained optimization approach, a sediment concentration lower than 19.96 kg/m3 in the discharge from Xiaolangdi Reservoir is determined to be the critical controlling condition for achieving full-stream erosion in the lower Yellow River under the average discharge level observed during 1960-1987; however, it is challenging to achieve full-stream erosion under the average discharge level of 1988-2017. Although this erosion status could potentially be achieved through continued implementation of the WSRS, its sustainability is restricted by the declining storage capacity of Xiaolangdi Reservoir, decreasing water discharge levels and riverbed coarsening in the Yellow River. It is necessary to design cross-basin collaboration measures for the upper, middle and lower Yellow River to achieve sustainable sediment reduction and healthy development of the Yellow River basin as a whole.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Gradually Varying Flow
Energy Considerations in Open Channel Flow
Rapidly Varying Flow
Underflow Gates
Typical Model Studies

