Evaluation method on seismic risk of substation in strong earthquake area
Jiawei Cui1, Ailan Che1, Sheng Li2
1Department of Civil Engineering, Shanghai Jiao Tong University, Shanghai, China.
Abstract:
Frequent earthquakes in strong earthquake areas pose a great threat to the safety operation of electric power facilities. There exists a pressing research need to develop an assessment method for the seismic risk of substations, i.e., the hubs of power system networks. In this study, based on Incremental Dynamic Analysis (IDA), Probabilistic Seismic Demand Model (PSDM) and reliability theory, a vulnerability model for a substation is obtained, based on considering the relationships between Peak Ground Acceleration (PGA) and four seismic damage states (complete, extensive, moderate, and slight.) via a probabilistic approach. After an earthquake, the scope of influence and PGA distribution are evaluated using information recorded by the seismic observation stations, based on using interpolation or an empirical formula for the PGA attenuation. Therefore, the seismic risk can be evaluated by combining ground motion evaluation and the pre-built vulnerability model. The Wuqia- Kashgar area of Xinjiang was selected as the study area; it is an Earthquake-prone area, and one of the starting points for new energy transmission projects in China. Under a hypothetical earthquake (MS 7.9), the seismic risk of the substations was evaluated. The results show that: this method is able to give the probabilities of the four damage states of the substations, four substations close to the epicenter only have a probability of slight damage (45%-88%) and other substations are safer.
Related Concept Videos
Power System Three-Phase Short Circuits
Design Consideration
The factor of safety is another key...
Transformers in Distribution System
Distribution substation transformers come in various ratings and typically use mineral oil for insulation and cooling. To prevent moisture and air from entering the oil, some transformers use an inert gas like nitrogen to fill the...
Insulation Coordination
Bus Impedance Matrix
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
Zones of Protection
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...