Related Experiment Video
Updated: Oct 5, 2025

Spatial Multiobjective Optimization of Agricultural Conservation Practices using a SWAT Model and an Evolutionary Algorithm
Published on: December 9, 2012
Coordinated Development of Population, Resources, Environment, Economy, and Society under Engineering Management
1School of Economics and Trade, Northeastern University at Qinhuangdao, Qinhuangdao 066000, China.
Abstract:
The in-depth analysis of the strategies for the coordinated and continuous development of population, resources, environment, economy, and society based on the engineering management model is highly important for the sustainable development of the regional economy and society. In this article, a population-economy-resources-environment bilevel optimization model is established based on the economic and social development in a provincial region. The method of bilevel optimization is adopted to introduce the specific bilevel optimization model. The concept and objectives of the bilevel optimization are explained, and its corresponding technical applications are described. In this article, the development in coordinated economic and social development of population, resources, and environment is analyzed and compared based on the bilevel optimization model. In particular, the evolution and changes before and after the implementation of engineering management are studied. Through the results, it can be observed that after the implementation of project management, the coefficient of industry location has presented a downward trend, and the coordinated development of population, resources, environment, economy, and society has become more coordinated.
Related Concept Videos
Mechanistic Models: Compartment Models in Algorithms for Numerical Problem Solving
In individual population analyses, different algorithms are employed, such as Cauchy's method, which uses a...
Mechanistic Models: Compartment Models in Individual and Population Analysis
Sustainable Development
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Alignment of a Road Line Using GIS
Response Surface Methodology
The process of RSM involves several key steps:

