Evaluation of Workability and Structuration Rate of Locally Developed 3D Printing Concrete Using Conventional Methods

Sara Ahmed1, Sherif Yehia1

  • 1Civil Engineering Department, American University of Sharjah, Sharjah 26666, United Arab Emirates.

Related Concept Videos

Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
130
Workability of Concrete01:25

Workability of Concrete

The workability of concrete is a crucial property that affects its handling, placing, and finishing during construction. It describes the ease with which concrete can be mixed, placed, compacted, and finished. Workability is primarily concerned with the concrete's movement and its ability to resist internal friction and external resistance from molds and reinforcements during the application process.
Concrete's workability is determined by its resistance to internal forces that arise...
184
Concrete01:20

Concrete

Concrete is a vital construction material extensively used worldwide, primarily valued for its strength, durability, and versatility, which it provides for various structural designs. Concrete generally comprises ingredients like Portland cement, coarse gravel, fine sand, and water. Concrete can be mixed by simple hand methods or industrially at computer-controlled plants. The mixture consists of aggregates and a paste made from water and Portland cement. This paste coats the aggregates and,...
494
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
204
Accelerated Curing of Concrete01:25

Accelerated Curing of Concrete

Accelerating concrete curing is achieved by applying heat and additional moisture. This process accelerates the hydration of the cement, resulting in an earlier strength gain in the concrete. Steam curing is a method wherein the concrete products are either transported through a chamber on a conveyor belt or encased in plastic, allowing steam at atmospheric pressure to circulate freely around them. This process begins with a phase of moist curing that typically lasts between 3 to 5 hours, after...
281
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
213