Action selection in risk assessment with fuzzy Fine-Kinney-based AHP-TOPSIS approach: a case study in gas plant

Bahar Dogan1, Murat Oturakci2, Cansu Dagsuyu1

  • 1Industrial Engineering Department, Faculty of Engineering, Adana Alparslan Türkeş Science and Technology University, Adana, Turkey.

Related Concept Videos

The Availability Heuristic01:08

The Availability Heuristic

A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
6.6K
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
120
Reclosers and Fuses01:26

Reclosers and Fuses

Automatic circuit reclosers enhance the protection of distribution circuits by interrupting and auto-reclosing an AC circuit according to a preset sequence. They effectively manage temporary faults on overhead distribution lines, often caused by tree limbs or wildlife, by briefly disrupting service to improve overall reliability. However, contact with reclosers or energized broken conductors on the ground can pose serious hazards.
A comprehensive protection scheme for radial distribution...
173
Hazard Rate01:11

Hazard Rate

The hazard rate, also known as the hazard function or failure rate, is a statistical measure used to describe the instantaneous rate at which an event occurs, given that the event has not yet happened. From a probabilistic perspective, it represents the likelihood that a subject will experience the event in a very small time interval, conditional on surviving up to the beginning of that interval. In terms of frequency, the hazard rate can be viewed as the ratio of the number of events to the...
196
Manipulation and Analysis01:21

Manipulation and Analysis

GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
72
Decision Making: P-value Method01:09

Decision Making: P-value Method

The process of hypothesis testing based on the P-value method includes calculating the P- value using the sample data and interpreting it.
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim  is also stated. These statements can act as null and alternative hypotheses:  a null hypothesis would be a neutral statement while the alternative hypothesis can...
5.8K