Related Experiment Video
Updated: Aug 29, 2025

Generating Lap Joints Via Friction Stir Spot Welding on DP780 Steel
Published on: August 13, 2019
Research on Filling Strategy of Pipeline Multi-Layer Welding for Compound Narrow Gap Groove
Tie Yin1,2, Jinpeng Wang3, Hong Zhao1
1College of Mechanical and Transportation Engineering, China University of Petroleum-Beijing, Beijing 102249, China.
Abstract:
With the increase in transmission pressure and pipe diameter of long-distance oil and gas pipelines, automatic welding of the pipeline has become the mainstream welding method. The multi-layer and multi-pass welding path planning of large-diameter pipelines with typical narrow gap grooves are studied, and a welding strategy for pipeline external welding robot is proposed. By analyzing the shape of the weld bead section of the narrow gap groove and comparing the advantages and disadvantages of the equal-height method and the equal-area method, the mathematical model of the filling layer is established. Through the test and analysis in the workshop, the predicted lifting value meets the actual welding requirements. The microstructure of the weld was analyzed by SEM. The main structure of the weld was fine acicular ferrite, which could improve the mechanical properties of the welded joint. After multi-layer filling, the filling layer is flush with the edge of the groove. The establishment of this model lays a foundation for the formulation of welding process parameters for large-diameter pipes and the off-line programming of welding procedures.
More Related Videos
05:32A Soft Tooling Process Chain for Injection Molding of a 3D Component with Micro Pillars
Published on: August 4, 2018
08:40Ultrasonic Welding of Thermoplastic Composite Coupons for Mechanical Characterization of Welded Joints through Single Lap Shear Testing
Published on: February 11, 2016
Related Concept Videos
Steel Fastening Techniques
Rivets are cylindrical steel fasteners with a specially designed head. During application, rivets are heated until white-hot and then inserted through pre-drilled holes in the steel sections. A pneumatic hammer is used to shape the exposed end into a second head, securing the sections together.
Bolting is another...
Thin-Walled Hollow Shafts
Types of Building Separation Joints
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
Single Pipe Systems
In a Type I problem, fluid properties (density and viscosity), pipe characteristics (including diameter, length, and surface roughness), and the flow rate or average velocity are...
Multiple Pipe Systems
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
Design Example: Flow of Oil Through Circular Pipes