Abstract:
To better understand the seepage field in tailings dam with a drainage structure that combines drainage mat, drainage tube, and geotextile, an equivalent seepage analysis method for the drainage structure is presented. In the method, an equivalent drainage structure is suggested to replace the original drainage. It has enough size to be easily presented in the three-dimensional (3d) model of a tailings dam. According to a back analysis procedure using the quasi-3d models of a tailings dam with original and equivalent drainage structures, the material properties of the equivalent drainage structure can be obtained under the principle of drainage capacity equivalence. It is demonstrated that the suggested method is accurate enough to capture the seepage field in a tailings dam based on comparing the calculated and measured phreatic lines in a tailings dam for verification. Then, the method is employed to investigate the seepage field in a tailings dam in China for a case study. The rise of water level, damage of drainage structure, or increase of tailings discharge speed and time will lift up phreatic line. After terminating tailings discharge, phreatic line will first rise and then fall. The effect of tailings discharge on phreatic line will almost disappear after terminating tailings discharge for 24 h.
More Related Videos
Related Concept Videos
Design Example: Creating a Hydraulic Model of a Dam Spillway
Design Example: Maintaining Level of an Embankment
Design Example: Design of an Irrigation Channel
Typical Model Studies
Weir: Problem Solving
Uniform Depth Channel Flow: Problem Solving