Related Experiment Video
Updated: Aug 18, 2025

Electrochemically and Bioelectrochemically Induced Ammonium Recovery
Published on: January 22, 2015
Start-up and optimization of a one-stage partial nitrification-anammox (PN-A) process treating low ammonium
Chi Zhang1, Lianze Yu1, Miao Zhang1
1School of Environmental Engineering and Science, Yangzhou University, 196 West Huayang Road, Yangzhou, 225127, Jiangsu, China.
Abstract:
Although the partial nitrification-anammox process (PN-A) has achieved great success in nitrogen removal for the high ammonium concentration wastewater, its application is still limited in low ammonium concentration wastewater treatment due to its instability and low nitrogen removal efficiency. In this study, a sequencing batch reactor (SBR) with continuous aeration was employed to enrich ammonia oxidation bacteria (AOB) and suppress nitrite oxidation bacteria (NOB) first; then, the SBR was operated intermittently aerated SBR (IASBR), to which the anammox granular sludge (AMX) was added to achieve complete autotrophic nitrogen removal under low influent ammonium concentration of 100 mg/L. A mathematical model was used to optimize the IASBR aeration strategy to achieve sub-optimal nitrogen removal. The experimental results showed that high nitrite accumulation efficiency (above 80%) in the SBR and a fast start-up within 100 days and a stable TN (total nitrogen) removal efficiency of 70% were achieved in the IASBR. Meanwhile, the simulation results indicated that keeping aeration duration at 4 h, kLa (oxygen transfer coefficient) at 50 day-1, or aeration duration at 2.5 h, kLa at 80 day-1 could obtain a higher total nitrogen removal efficiency (TNR) (TNR > 80%), and the TN removal could also be improved by increasing hydraulic retention time (HRT) under the optimal oxygen supply rate.
Related Concept Videos
Metabolism of Chemolithotrophs
Inorganic Nitrogen Assimilation