Managing business continuity in the Arctic: Experiences from mining.

Jacob Taarup-Esbensen1,2

  • 1University of Stavanger, Stavanger, Norway.

Summary

Organizations must actively reassess risks, even for familiar events, to enhance business continuity capacity. Experience alone does not guarantee effective recovery from critical incidents.

Related Concept Videos

Applications of GIS: Disaster Management and Emergency Response01:29

Applications of GIS: Disaster Management and Emergency Response

Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
132
Threats to Biodiversity01:50

Threats to Biodiversity

There have been five major extinction events throughout geological history, resulting in the elimination of biodiversity, followed by a rebound of species that adapted to the new conditions. In the current geological epoch, the Holocene, there is a sixth extinction event in progress. This mass extinction has been attributed to human activities and is thus provisionally called the Anthropocene. In 2019 the human population reached 7.7 billion people and is projected to comprise 10 billion by...
22.6K
Cold Weather Concreting01:27

Cold Weather Concreting

When freshly poured concrete is exposed to freezing temperatures before it has set, the water within the concrete can freeze. This expansion disrupts the setting process, delays chemical reactions necessary for hardening, and increases the volume of pores within the hardened concrete, which weakens its overall structure. If the concrete manages to reach an appreciable strength before it freezes, the damage can be somewhat mitigated.
To counteract the negative impacts of cold weather, ensuring...
101
Masonry in Cold and Hot Weather Conditions01:21

Masonry in Cold and Hot Weather Conditions

In cold weather, masonry construction requires specific precautions to ensure mortar does not freeze before curing, as this can significantly weaken its strength and watertightness. Mortar temperature should be maintained between 60°F and 80°F to support proper hydration and curing. Below 40°F, mortar water must be heated, but should not exceed 120°F as high temperatures can reduce mortar's compressive and bond strength.