Related Experiment Video
Updated: Aug 12, 2025

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Assessing relationships between onsite wastewater treatment system maintenance patterns and system-level variables
Kyle N Connelly1, Seth J Wenger1, Nandita Gaur2
1Odum School of Ecology, University of Georgia, Athens, GA 30602, USA; The River Basin Center, University of Georgia, Athens, GA 30602, USA.
Millions of households use onsite wastewater treatment systems (OWTSs). Older and new OWTSs show higher failure rates, indicating a need for targeted maintenance and early inspections to ensure system longevity and prevent pollution.
Area of Science:
- Environmental Engineering
- Water Resource Management
- Public Health
Background:
- Millions of households worldwide depend on onsite wastewater treatment systems (OWTSs) for safe wastewater disposal.
- Conventional subsurface OWTSs are cost-effective but can cause nonpoint pollution if malfunctioning.
- Understanding OWTS maintenance and failure is crucial for watershed protection.
Purpose of the Study:
- To investigate the relationship between OWTS age, environmental factors, and system maintenance/failure.
- To identify key drivers influencing the longevity and performance of septic systems.
- To inform strategies for prioritizing OWTS repair and replacement.
Main Methods:
- Analysis of OWTS repair and pumping records in Athens-Clarke County, Georgia.
- Correlation of system age and environmental characteristics with failure indicators.
- Statistical examination of OWTS performance across different age groups.
Main Results:
- 7.8% of 8826 OWTSs were repaired over 78 years; median age of repaired systems was 65 years.
- 12.2% of OWTSs required pumping within 38 months (5.7% annualized rate).
- Systems over 50 years old and new systems (2-10 years) showed the highest probability of hydraulic failure.
Conclusions:
- OWTS repair and replacement efforts should prioritize aging systems nearing end-of-life.
- Early-stage hydraulic failures in new OWTSs necessitate prompt inspection one year post-installation.
- This reproducible approach can guide local authorities in prioritizing wastewater infrastructure investments and policies.
Related Concept Videos
Design Example: Designing a Residential Plumbing System
Typical Model Studies
Factors Affecting Solubility
Factors Affecting Workability
Environmental Applications of Microorganisms
Design Example: Creating a Hydraulic Model of a Dam Spillway

