Failsafe points in data centre disaster recovery response
1Independent Consultant in Data Centre Disaster Recovery Planning and Technical Programme Management.
Abstract:
Certain social psychological variables can result in delays to essential steps in IT data centre disaster recovery response, including the formal declaration of disaster. These delays can result in failure to meet recovery time objectives, additional financial losses, regulatory issues and a significant loss of customer goodwill, all beyond what would have been incurred in the absence of delays. This paper describes a failsafe model to counter these variables. The model will help ensure that any disaster recovery response step earmarked as a failsafe point is completed in a timely manner, from the moment of disaster to the resumption of business.
Related Concept Videos
Reclosers and Fuses
A comprehensive protection scheme for radial distribution...
Zones of Protection
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...
Radial System Protection
In a radial system with a fault downstream of the third breaker, ideally, only the third breaker will open, isolating the fault and interrupting the load connected beyond it. The second breaker has a longer delay setting,...
Distribution Reliability and Automation
Guidelines and Strategies for Safe Computer Charting
Maintain Confidentiality and Security:
Restarting Stalled Replication Forks