Quantitative Verification of Concrete Formwork-Striking-Time Reduction by High Blaine Ordinary Portland Cement
1Department of Architectural Engineering, Kongju National University, 1223-24 Cheonan-Daero, Cheonan City 330-717, Chungcheongnam-do, Republic of Korea.
Abstract:
Type Ⅰ high Blaine ordinary Portland cement (IHB) possesses the same composition as that of type Ⅰ ordinary Portland cement; however, due to its high fineness, IHB exhibits properties that are similar to those of type Ⅲ rapid-hardening Portland cement, which can reduce the formwork striking time. However, to date, no quantitative research results regarding the construction-time-reduction effect of IHB have been reported. Therefore, this study conducted experiments to verify the formwork-striking-time reduction effect of concrete using IHB. Considering seasonal changes, the strength-development characteristics, according to the outside air temperature, were examined by modifying the curing temperature conditions (5, 10, and 20 °C). Furthermore, the achievable reduction in the concrete formwork striking time was quantitatively determined by comparing and analyzing with the linear interpolation and maturity methods for improving the accuracy of the formwork striking time. The experimental results indicated that, compared with ordinary cement, early formwork striking is possible using IHB, due to earlier strength development. Thus, IHB was confirmed to be effective for construction-time reduction through early formwork striking, and it can be used as a sufficient substitute for expensive rapid-hardening cement in sites and weather conditions where rapid hardening is required.
More Related Videos
Related Concept Videos
Testing Water Quality
Strength of Cement
For compressive strength tests, ASTM C 109-05 standards prescribe a cement-sand mix ratio of 1:2.75 and a water/cement ratio of 0.485 for making 2-inch cubes. These cubes are mixed, cast, and cured in saturated lime water at 23°C until testing. Flexural strength testing, outlined in...
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...