Research on production capacity planning method of open-pit coal mine
Guangwei Liu1, Weiqiang Guo2, Senlin Chai3
1School of Mining, Liaoning Technical University, Fuxin, 123000, China.
Abstract:
Reasonable production capacity is related to the economic benefits of an open-pit coal mine. This study analyzes the relationship between the working face length, the annual advancing speed and the production capacity. It constructs a production capacity function relationship model. Take the Baorixile open-pit coal mine as an example. The remaining unmined parts are divided into four regions, and the range of production capacity in each region is analyzed by the established model and the determined respectively. On this basis, three mining district division plans are proposed. By analyzing and comparing the stripping ratio, mining life of the district, fault influence, difficulty of transition connection in the mining districts, the convenience of transportation system layout and other indexes of each plan, Plan 3 is determined to be the optimal plan. The production capacity planning results of each mining district in this plan are as follows: the production capacity of the 3rd mining district is 30-35 Mt/a; the production capacity of the 4th mining district in Region 1 is 20-31 Mt/a, and the production capacity in Region 2 is 24-33 Mt/a; the production capacity of the 5th mining district is 20-27 Mt/a.
Related Concept Videos
Sampling Plans
Random sampling is a method where each member of the population has an equal chance of being selected for the sample. It involves selecting individuals randomly, often using random number generators or lottery-type methods. For example, when analyzing the properties of a...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Aggregate Gradation
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Planning Nursing Care I