Revisiting predictions of movie economic success: random Forest applied to profits
Thaís Luiza Donega E Souza1, Marislei Nishijima2, Ricardo Pires3
1Information Systems Department, University of São Paulo, 1000, Arlindo Béttio - Ermelino Matarazzo, 03828-000, Room: L1 - 327, São Paulo, SP Brazil.
Abstract:
Previous studies have employed machine learning tools to classify films according to success to guide a reduction in the degree of uncertainty of film production. We revisited the literature to contribute to three relevant issues in classifying films according to economic success. First, we explored the differences between the results of the shortest or longest samples in terms of time to study possible changes in patterns of consumption mainly due to technological changes and between total and wide-released films. Second, we used profits free of price inflation as measures of economic success instead of the usual box office nominal revenues. Third, we employed a smaller set of features, only the ones available at the time of production, to help producers maneuver contingencies since little or nothing can be done by the time a film is in the theaters. We followed the literature to choose the classifiers - Random Forest, Support Vector Machine, and Neural Network - and designed sub-datasets to model and compare the performance of our results. Our dataset includes all films with budgets disclosed at the Box Office Mojo website, resulting in 3167 movies released at theaters worldwide between 1980 and 2019. The Random Forest results outperform previous similar studies with different sampling in time, including results for a less usual larger sample, with the best data sample about 97% both in accuracy and F1-score.
Supplementary Information:
The online version contains supplementary material available at 10.1007/s11042-023-15169-4.
Related Concept Videos
Survival Tree
Building a Survival Tree
Constructing a...
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Residuals and Least-Squares Property
If the observed data point lies above the line, the residual is positive, and the line underestimates the actual data value for y. If the observed data point lies below the line, the residual is negative, and the line overestimates the actual data value for y.
The process of fitting the best-fit...
Residual Plots
When the residual values are plotted against the variable x, it is called a residual...
Outliers and Influential Points
Microsoft Excel: Regression Analysis
To perform regression...


