Related Experiment Video
Updated: Jul 24, 2025

Applying Hyperspectral Reflectance Imaging to Investigate the Palettes and the Techniques of Painters
Published on: June 18, 2021
Digital Twinning for 20th Century Concrete Heritage: HBIM Cognitive Model for Torino Esposizioni Halls
Antonia Spanò1, Giacomo Patrucco1, Giulia Sammartano1
1LabG4CH-Laboratory of Geomatics for Cultural Heritage, DAD-Department of Architecture and Design, Politecnico di Torino, Viale Mattioli 39, 10125 Torino, Italy.
Abstract:
In the wide scenario of heritage documentation and conservation, the multi-scale nature of digital models is able to twin the real object, as well as to store information and record investigation results, in order to detect and analyse deformation and materials deterioration, especially from a structural point of view. The contribution proposes an integrated approach for the generation of an n-D enriched model, also called a digital twin, able to support the interdisciplinary investigation process conducted on the site and following the processing of the collected data. Particularly for 20th Century concrete heritage, an integrated approach is required in order to adapt the more consolidated approaches to a new conception of the spaces, where structure and architecture are often coincident. The research plans to present the documentation process for the halls of Torino Esposizioni (Turin, Italy), built in the mid-twentieth century and designed by Pier Luigi Nervi. The HBIM paradigm is explored and expanded in order to fulfil the multi-source data requirements and adapt the consolidated reverse modelling processes based on scan-to-BIM solutions. The most relevant contributions of the research reside in the study of the chances of using and adapting the characteristics of the IFC (Industry Foundation Classes) standard to the archiving needs of the diagnostic investigations results so that the digital twin model can meet the requirements of replicability in the context of the architectural heritage and interoperability with respect to the subsequent intervention phases envisaged by the conservation plan. Another crucial innovation is a proposal of a scan-to-BIM process improved by an automated approach performed by VPL (Visual Programming Languages) contribution. Finally, an online visualisation tool enables the HBIM cognitive system to be accessible and shareable by stakeholders involved in the general conservation process.
Related Concept Videos
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
Design Example: Dimensioning of Concrete Masonry Construction
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
Masonry Curtain Walls
Fiber Reinforced Concrete
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Reinforced Brick Masonry
To fortify brick walls...

