Related Experiment Video
Updated: Jul 16, 2025

Watershed Planning within a Quantitative Scenario Analysis Framework
Published on: July 24, 2016
Assessing the long-term impact of cascade hydropower development on the inundation patterns of floodplain wetlands
Jing Li1, Xiaorong Lu2, Xuelei Wang2
1Key Laboratory for Environment and Disaster Monitoring and Evaluation of Hubei, Innovation Academy for Precision Measurement Science and Technology, Chinese Academy of Sciences, Wuhan, 430077, China; University of Chinese Academy of Sciences, Beijing, China.
Abstract:
The inundation process of floodplain wetlands plays a crucial role in maintaining the balance of river ecosystems, which are highly sensitive to hydrological alteration. Nevertheless, the specific mechanisms through which these hydrological changes affect the inundation patterns of floodplain wetlands are still unclear. This study aimed to investigate the impact mechanism of cascade hydropower development on the inundation process of floodplain wetlands. Multitemporal remote sensing datasets and long-term hydrometeorological data series were utilized in this study. By employing the water appearance frequency (WAF) index, wetland hydrological stability assessment, and wavelet analysis, the inundation changes in floodplain wetlands and the underlying hydrological driving mechanisms were examined. The results revealed significant alterations in the inundation frequency of floodplain wetlands due to the construction of upstream dams. Specifically, the construction of the Danjiangkou and Wangfuzhou dams led to an increase in the total inundated area of Part A (16.09 km2) and Part B (76.93 km2), respectively. Conversely, the moderate frequency inundation zone in Part C decreased (26.7 km2) after the construction of the Cuijiaying Dam. The typical floodplain wetland 7 shifted from high to low (8.94 km2) stability after the construction of the Cuijiaying Dam. Furthermore, the cascade hydropower dam construction resulted in increased fluctuations in downstream water discharge. This study provides an effective approach to understanding the impact of cascade hydropower dams on the inundation process of floodplain wetlands.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Creating a Hydraulic Model of a Dam Spillway
Responses to Drought and Flooding
Rapidly Varying Flow
Underflow Gates
Hydraulic Jump: Problem Solving

