Linking G2SFCA method and circuit theory to promote spatial equity and landscape connectivity in urban ecological

Longyang Huang1, Yu Lu1, Jing Wang2

  • 1School of Public Policy and Administration, Chongqing University, Chongqing 400044, China.

PubMed

Related Concept Videos

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
52
SFG Algebra01:16

SFG Algebra

In Signal Flow Graph (SFG) algebra, the value a node represents is determined by the sum of all signals entering that node. This summed value is then transmitted through every branch leaving the node, making the SFG a powerful tool for visualizing and analyzing control systems.
Each node in an SFG corresponds to a variable, and the interactions between nodes are represented by branches with associated gains. When multiple branches lead into a node, the value at that node is the sum of the...
121
Manipulation and Analysis01:21

Manipulation and Analysis

GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
28
Thematic Layering in GIS01:30

Thematic Layering in GIS

In the past, planning projects such as schools or public facilities required extensive manual effort to gather and compile data. Information such as property boundaries, soil characteristics, road networks, zoning regulations, and flood zones had to be sourced individually from courthouses, utility providers, and registry offices. Assembling these datasets into a coherent format often took several months, delaying project timelines.The introduction of Geographic Information Systems (GIS)...
40
Circuit Terminology01:14

Circuit Terminology

An electrical network is a system composed of interconnected elements, such as resistors, capacitors, inductors, and voltage or current sources. Unlike a circuit, an electrical network does not necessarily form a closed path. In other words, while all circuits can be considered networks due to their interconnected nature, not every network qualifies as a circuit.
A circuit, on the other hand, is also an interconnected system of electrical elements but must contain one or more closed paths.
1.6K
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
52