Related Experiment Video
Updated: Jul 11, 2025

Visualizing Lung Cellular Adaptations during Combined Ozone and LPS Induced Murine Acute Lung Injury
Published on: March 21, 2021
Process for maintaining appropriate air quality in a hospital setting during and following a nearby building
M Elena McLaughlin1, Tina Henderson1, Linette Leadon1
1Environmental Health & Safety, The University of Texas at MD Anderson Cancer Center, Houston, TX, USA.
Abstract:
Air quality in a cancer facility is integral to the success of patient treatment. The organization must be committed to providing a patient care environment free of physical and biological hazards that result from construction and demolition activities. This project intended to safely demolish a derelict building in Texas while minimizing air quality risks and impacts to nearby hospitals and a proximal cancer hospital. Two of the neighboring facilities were less than 18 feet (5.5 m) away from the demolition location. Adjacent facilities included inpatient and outpatient cancer treatment clinics, a large data center, a pediatric hospital complex, and a heart institute. Plans to minimize infection risks and dust for respective facilities were designed before implosion and remained in place until total debris removal. Risk assessments of nearby buildings were completed to determine the appropriate precautions and physical barriers needed. Culturable and non-culturable fungal air samples were collected during implosion to verify the management of outside contaminants. Additionally, continuous particulate and routine sampling for culturable and non-culturable fungi were performed for approximately 7 months after the project demolition. Air sampling results from 32 internal areas indicated that most areas remained at pre-implosion background levels. Areas that experienced elevated particle counts were cleaned and resampled, and baseline values returned to pre-implosion levels within 12 hr. Fungal air sampling results were acceptable based on predetermined infection control guidelines. The building was successfully demolished via implosion with no injuries and minimal damage to nearby facilities. The team learned that an integrated approach to project management that includes all stakeholders is essential to success. Contingency planning should account for all variables; no assumptions should be made. Staffing plans should be reviewed to ensure the sampling strategy developed can be implemented appropriately.
Related Concept Videos
Transmission-based Precautions II: Airborne and Protective Environment
Airborne precautions:
Use airborne precautions when treating patients known or suspected to have diseases that spread through the air—for example, tuberculosis or measles. These organisms are present in smaller droplets expelled by an infected person and...
Acute Respiratory Failure-V
Ensure that patients are monitored continuously for their response to therapy, including changes in...
Pulmonary Cycle: Exhalation
Oxygen Delivering System II: Venturi Mask and Transtracheal Oxygen
Venturi Mask
The Venturi mask, named after the Venturi effect, is designed to deliver precise oxygen concentrations. It consists of a large tube with an oxygen inlet that narrows down, causing a pressure drop that pulls air in through adjustable side ports. The mask is a lightweight,...
Pneumonia V: Nursing management and Prevention
The nurse must practice strict medical asepsis and adhere to infection control guidelines to minimize healthcare-associated infections.
Enhance airway patency
Position the patient correctly to facilitate drainage of the affected lung segments. Manual or mechanical percussion and vibration can also be employed....
Pneumonia I: Introduction
Risk Factors
Various factors influence the likelihood of developing pneumonia. Age plays a crucial role, with infants, children under two, and individuals over 65 at increased risk due to their...

