Naturally occurring radioactive materials in offshore infrastructure: Understanding formation and characteristics of baryte scale during decommissioning planning
Related Experiment Video
Updated: Jul 5, 2025

Separation of Uranium and Thorium for 230Th-U Dating of Submarine Hydrothermal Sulfides
Published on: May 20, 2019
Amy MacIntosh1, Daniel T Oldfield2, Dioni I Cendón3
1Australian Nuclear Science and Technology Organisation (ANSTO), Lucas Heights, Locked Bag 2001, NSW, 2232, Australia; School of Natural Sciences, Wallumattagal Campus, Macquarie University, Ryde, Sydney, NSW, Australia.
Abstract:
Contaminants, including naturally occurring radioactive material (NORM) of the 238-uranium and 232-thorium decay series, have been recognized as a global research priority to inform offshore petroleum infrastructure decommissioning decisions. This study aimed to characterize pipeline scale retrieved from a decommissioned subsea well tubular pipe through high-resolution elemental mapping and isotopic analysis. This was achieved by utilizing transmission electron microscopy, Synchrotron x-ray fluorescence, photostimulated luminescence autoradiography and Isotope Ratio Mass Spectrometry. The scale was identified as baryte (BaSO4) forming a dense crystalline matrix, with heterogenous texture and elongated crystals. The changing chemical and physical microenvironment within the pipe influenced the gradual growth rate of baryte over the production life of this infrastructure. A distinct compositional banding of baryte and celestine (SrSO4) bands was observed. Radioactivity attributed by the presence of radionuclides (226Ra, 228Ra) throughout the scale was strongly correlated with baryte. From the detailed scale characterization, we can infer the baryte scale gradually formed within the internals of the tubular well pipe along the duration of production (i.e., 17 years). This new knowledge and insight into the characteristics and formation of petroleum waste products will assist with decommissioning planning to mitigate potential radiological risks to marine ecosystems.
Related Concept Videos
Radioactive Decay and Radiometric Dating
Nuclear Transmutation

