Engineering design and application of large-scale oil-based drilling cuttings treatment project

Yue Zhou1, Chao Deng2, Xiao Chen2

  • 1Department of Environmental Science and Engineering, Beijing University of Chemical Technology, Beijing, China.

Related Concept Videos

Bioremediation00:46

Bioremediation

Bioremediation is the use of prokaryotes, fungi, or plants to remove pollutants from the environment. This process has been used to remove harmful toxins in groundwater as a byproduct of agricultural run-off and also to clean up oil spills.
18.3K
Design Example: Design of an Irrigation Channel01:27

Design Example: Design of an Irrigation Channel

Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
97
Design Example: Flow of Oil Through Circular Pipes01:25

Design Example: Flow of Oil Through Circular Pipes

Understanding fluid flow behavior through pipes is critical in fluid mechanics, especially in applications like oil transportation through pipelines. Hagen-Poiseuille's law provides an exact solution derived from the Navier-Stokes equations for steady, incompressible, and laminar flow within a circular pipe. Hagen-Poiseuille's law helps determine the necessary pressure drop across a pipeline section by determining parameters like pipe length, radius, oil viscosity, and the desired...
124
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
63