Production line balance problem identification and improvement based on decision tree: A case study of commercial air
Rui Wang1, Tengyuan Xin1, Shun Jia1
1Department of Industrial Engineering, College of Energy and Mining Engineering, Shangdong University of Science and Technology, Qingdao, China.
Abstract:
In the production of air conditioners, there are various issues such as complex requirements, redundant stations, excessive man-hours, and low production line balance rate. This paper aims to address these problems by analyzing the historical data of H Company's commercial air conditioner production line. The data is categorized into five aspects: station, working hours, standard working hours, labor capacity, and presence of bottleneck processes. To optimize and improve the second production line, this paper applies the production line balance management method based on data mining. It utilizes the decision tree model in data mining and incorporates lean production knowledge from industrial engineering. The goal is to identify crucial factors that affect the balance of the production line and address the issues caused by these factors. The aim is to reduce and eliminate redundant working hours and enhance the balance rate of the production line. By implementing the approach outlined in this paper, the bottleneck time of the second production line was reduced from 96.67 s to 74.6 s, and the production line balance rate increased from 68% to 85%.
More Related Videos
10:36Author Spotlight: Optimization of Airflow Velocities in Battery Cooling Systems for Enhanced Thermal Performance and Reduced Energy Consumption
Published on: November 3, 2023
09:16Author Spotlight: Optimization of Processing Technology for Tiebangchui with Zanba Based on CRITIC Combined with Box-Behnken Response Surface Method
Published on: May 12, 2023
Related Concept Videos
The Power Flow Problem and Solution
Production Efficiency
Multimachine Stability
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
Reducing Line Loss
With a step-up transformer at the source, the voltage is increased, thereby reducing the current in the transmission lines since power loss...
Line Loss
Line loss impacts power delivery efficiency in a balanced three-phase circuit. The symmetry in such a circuit simplifies the...
Maximum Power Flow and Line Loadability