Reliable Tilt-depth estimates based on the stable computation of the tilt angle using robust vertical derivatives

Kamal Abdelrahman1, Luan Thanh Pham2, Saulo Pomponet Oliveira3

  • 1Department of Geology and Geophysics, College of Science, King Saud University, P.O. Box 2455, 11451, Riyadh, Saudi Arabia.

Scientific Reports
|March 29, 2024
PubMed

Related Concept Videos

Beams with Unsymmetric Loadings01:17

Beams with Unsymmetric Loadings

Analyzing a supported beam under unsymmetrical loadings is essential in structural engineering to understand how beams respond to varied force distributions. This analysis involves calculating the deflection and identifying points where the slope of the beam is zero, which are crucial for ensuring structural stability and functionality.
The first moment-area theorem determines the slope at any point on the beam. This theorem indicates that the change in slope between two points on a beam...
119
Relative Motion Analysis using Rotating Axes01:25

Relative Motion Analysis using Rotating Axes

Consider a component AB undergoing a linear motion. Along with a linear motion, point B also rotates around point A. To comprehend this complex movement, position vectors for both points A and B are established using a stationary reference frame.
However, to express the relative position of point B relative to point A, an additional frame of reference, denoted as x'y', is necessary. This additional frame not only translates but also rotates relative to the fixed frame, making it...
460
Relative Motion Analysis using Rotating Axes-Problem Solving01:29

Relative Motion Analysis using Rotating Axes-Problem Solving

Consider a crane whose telescopic boom rotates with an angular velocity of 0.04 rad/s and angular acceleration of 0.02 rad/s2. Along with the rotation, the boom also extends linearly with a uniform speed of 5 m/s. The extension of the boom is measured at point D, which is measured with respect to the fixed point C on the other end of the boom. For the given instant, the distance between points C and D is 60 meters.
Here, in order to determine the magnitude of velocity and acceleration for point...
402
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
72
Differential Leveling01:12

Differential Leveling

Differential leveling is a precise method in surveying used to determine the elevation difference between two points. Its primary goal is to establish accurate vertical measurements to create level surfaces or grade lines critical for designing and constructing infrastructures such as roads, bridges, and buildings.The procedure for differential leveling begins with setting up and leveling the instrument at a point where the benchmark can be seen. The level rod is held on the benchmark (BM), and...
175
Influence of Earth's Curvature and Atmospheric Refraction on Leveling01:26

Influence of Earth's Curvature and Atmospheric Refraction on Leveling

During leveling, the Earth's curvature and atmospheric refraction introduce deviations in the line of sight from a true horizontal reference. When the line of sight is leveled, it remains perpendicular to the plumb line only at a single point. Beyond this, it deviates due to the Earth’s curvature, represented by the correction C. For a sight distance D, the deviation can be derived using the relationship:This relationship shows that the deviation increases quadratically with distance.
92