Gas explosion characteristics and spray control mechanism in underground square
Chunhua Zhang1,2, Jingyu Ma1,2, Jiahui Shen1,2
1School of Safety Science and Engineering, Liaoning Technical University, Fuxin, China.
None:
The spray system mechanism during a gas explosion in an underground square pipeline is complex. In this paper, the underground square of Fuxin City is selected as the research object. FLACS numerical simulation software is used to analyze the spatial and temporal distribution characteristics of a gas explosion in an underground square pipeline with an unopened spray system using combustion and combustion rate models. Different spray pressures were compared and analyzed to determine the optimal spray control pressure, and the spray system mechanism was clarified. The results revealed that the gas explosion overpressure is divided into the overpressure gentle, overpressure rising, and overpressure decay stages, corresponding to a trend of rapid growth and slow decline. The influence of spray pressure on the gas explosion exhibits a promotion-inhibition-promotion trend, corresponding to 0-0.2 MPa, 0.2-0.6 MPa, and 0.6-1.6 Mpa, respectively. The peak overpressure and overpressure propagation rates are the lowest at 0.6 MPa, and the explosion suppression effect is the most pronounced. The spray system mechanism varies with the explosion overpressure stages. Generally, the time to peak value, that is, the peak time, the overall duration of the explosion, and the duration of the explosion stage decrease, whereas the peak explosion overpressure decreases.
Related Concept Videos
Atomic Absorption Spectroscopy: Atomization Methods
Shotcrete
Flame Photometry: Overview
Atomic Emission Spectroscopy: Interference
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Atomic Emission Spectroscopy: Instrumentation