Integrating social equity in highway maintenance and rehabilitation programming: A quantitative approach

Jojo France-Mensah1, Chirag Kothari1, William J O'Brien1

  • 1Department of Civil, Architectural, and Environmental Engineering, The University of Texas at Austin, 301 E. Dean Keeton Street, ECJ 5.412, Austin, TX 78712, USA.

Sustainable Cities and Society
|May 13, 2024
PubMed

Related Concept Videos

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
47
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
61
Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
206
Quantitative Analysis01:12

Quantitative Analysis

Quantitative analysis is a technique for measuring the amount of specific constituents in a sample. When the sample's composition is unknown, qualitative analysis is performed first to identify its components, which ensures that the correct substances are measured during the quantitative phase.
In quantitative analysis, two key measurements are made: the sample quantity and a property proportional to the amount of the analyte (the substance being analyzed). This forms the basis of the...
290
Design Example: Joints in Concrete Pavements01:28

Design Example: Joints in Concrete Pavements

Concrete pavement joints are essential for maintaining the structural integrity and longevity of pavement by controlling where and how the pavement cracks. These joints can be categorized based on their functions, such as contraction or control joints, construction joints, isolation joints, and expansion joints.
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
181
Community Based Intervention01:30

Community Based Intervention

Community-based interventions in mental health represent a paradigm shift from institution-centered care to treatments embedded within the fabric of local communities. By prioritizing inclusion and leveraging existing societal structures, this approach fosters a supportive environment conducive to addressing mental health challenges while promoting individual dignity and agency.
Foundations of Community Mental Health Programs
Central to the success of community-based interventions is the...
41