Feasibility and Application of Local Closed-Loop Materials to Produce Compressed and Stabilized Earth Blocks

Catalina Reyna-Ruiz1, José Manuel Gómez-Soberón2, María Neftalí Rojas-Valencia3

  • 1Barcelona School of Architecture, Polytechnic University of Catalonia, 649 Diagonal Avenue, 08028 Barcelona, Spain.

PubMed

Related Concept Videos

Manufacture of Concrete Masonry Units01:27

Manufacture of Concrete Masonry Units

The process of manufacturing concrete masonry units begins by mixing stiff concrete composed of Portland cement, aggregates, and water. This mixture is then poured into metal molds. To ensure the concrete settles uniformly and to avoid separation of its components, the mixture in the molds is subjected to vibration. Shortly after, the still-wet blocks are removed from the molds and placed on racks.
These wet blocks are then transported for curing, which can occur in one of two environments: a...
93
Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
164
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
79
Bricks01:14

Bricks

Bricks, a fundamental building material, are crafted from fired clay and exhibit a range of shapes, sizes, and colors. The production process starts with extracting local clay or shale, which is then crushed, ground, and screened for a fine texture. The refined material is blended with water, creating a pliable mixture that can be formed into bricks using one of three processes: soft mud, dry press, or stiff mud methods.
Soft mud bricks are shaped in molds with high moisture content and can be...
90
Workability of Concrete01:25

Workability of Concrete

The workability of concrete is a crucial property that affects its handling, placing, and finishing during construction. It describes the ease with which concrete can be mixed, placed, compacted, and finished. Workability is primarily concerned with the concrete's movement and its ability to resist internal friction and external resistance from molds and reinforcements during the application process.
Concrete's workability is determined by its resistance to internal forces that arise...
102
Compacting Factor test01:22

Compacting Factor test

The compacting factor test is a method used to assess the workability of concrete. It is  especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...