Predictive model for the instability of flexible formwork concrete wall in secondary mining of non-pillar coal mining
Yanhui Zhu1, Ye Tian2, Peilin Gong3
1College of Mining Engineering, Taiyuan University of Technology, Taiyuan, 030024, China.
Abstract:
The secondary mining movement in non-pillar coal extraction causes significant overrun damage to flexible formwork concrete walls, leading to extensive deformation of roadway roof and bottom plates. This adversely affects working face efficiency and safety. The engineering context focuses on the non-pillar gob-side retaining walls in the 1315 working face of Zhaozhuang Coal Mine and the 23107 working face of Xiegou Coal Mine. Through on-site investigation, numerical simulation, theoretical analysis, and testing, we explore the stress migration law and destabilizing mechanism of the flexible formwork concrete wall influenced by the secondary mining movement of the coal-free pillar along the hollow wall. The research results showed that: (1) During the mining back process, the concrete wall formed with flexible formwork may experience stress concentration, leading to excessive damage and compromising mining safety. (2) Developing a predictive stress model for the concrete wall with flexible formwork is essential. If the stress surpasses the ultimate compressive strength during mining back, reinforcement becomes necessary.3) The length of damage overrun in the flexible formwork concrete wall exhibits two distinct stages as the distance back to mining increases. The first stage shows nearly linear growth, while the second stage indicates a decreasing growth rate, ultimately stabilizing. The application of Z6 concrete reinforcing agent effectively strengthens the flexible formwork concrete wall.
Related Concept Videos
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Masonry Curtain Walls
Expansion and Contraction in Masonry Walls
To...
Effects of Creep
Design Example: Managing Concrete Workability
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...