Conservative management of malpositioned maxillary anterior implant. Technique description and case report

Related Concept Videos

Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Endocarditis IV: Nursing Management01:29

Endocarditis IV: Nursing Management

Infective endocarditis (IE) is a chronic infection of the heart's endocardium, primarily affecting the heart valves. A detailed nursing assessment for a patient with IE involves collecting subjective and objective data to ensure an accurate diagnosis and timely intervention.Subjective DataThe nurse gathers information about the patient's symptoms and complaints during the subjective assessment. Patients with infective endocarditis often report non-specific symptoms that can mimic other...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...