Related Experiment Video
Updated: Jun 4, 2025

Assessment of Boron Doped Diamond Electrode Quality and Application to In Situ Modification of Local pH by Water Electrolysis
Published on: January 6, 2016
Exploring critical pathways using robust strategies: Nanodiamond electrocatalysts for promoting boron removal via
Yong-Uk Shin1, SungIl Yu2, Junbeom Jeon2
1Department of Global Smart City, Sungkyunkwan University (SKKU), 2066, Seobu-ro, Jangan-gu, Suwon, Gyeonggi-do, 16419, Republic of Korea.
Abstract:
This study presents the first instance of a crucial route for the efficient removal of boron from effluents using a strategically applied electrosorption technology using nanodiamonds annealed under argon (denoted as A-NDs). We demonstrate a significant enhancement in adsorption capacity for boron removal facilitated by a flow-through electrosorption cell, and outline the results of surface characterization and electrochemical activity tests of the fabricated nanodiamond (ND) anodes (e.g., Pristine ND and A-NDs annealed at 800 and 1200 ℃). To identify the role of DO in the electrosorption system, we compared the results obtained in the natural state (without gas purging) with those obtained with ambient air and N2 gas purging. In particular, the degree of electrode deterioration (change in the cathode carbon compositional ratio) during the charging process was characterized using X-ray photoelectron spectroscopy. Overall, our system exhibits a favorable boron removal capability (sorption capacity reached 10.5 μmol/g) and energy consumption of <3.4 kWh g-B. Finally, we developed a prediction model for effluent properties using time-series machine learning algorithms based on various electrosorption variables (e.g., DO, pH dynamics, charging/discharging modes and times, and voltage), Through post-process of constructed ML model, voltage showed significant predictive importance. Additionally, the necessity of sequential modeling was emphasized by SHAP analysis. The application of ML algorithms provided a novel approach for the system optimization of electrified water treatment.
More Related Videos
08:40Synthesis of Metal Nanoparticles Supported on Carbon Nanotube with Doped Co and N Atoms and its Catalytic Applications in Hydrogen Production
Published on: December 6, 2021
07:58Bio-inspired Polydopamine Surface Modification of Nanodiamonds and Its Reduction of Silver Nanoparticles
Published on: November 14, 2018