Related Experiment Video
Updated: May 29, 2025

Laboratory and Field Protocol for Estimating Sheet Erosion Rates from Dendrogeomorphology
Published on: January 7, 2019
A comprehensive analysis of time investment in skid trail planning for forest access
Marc Werder1, Leo Gallus Bont1, Janine Schweier1
1Swiss Federal Institute for Forest, Snow and Landscape Research (WSL), Birmensdorf, Switzerland.
Abstract:
Properly planned skid trails form an important basis for sustainable timber production. They affect cost-effectiveness and the environmental impact of the harvesting process to a large extent. Here, we conducted an economic analysis to understand the skid trail planning process and to generate an initial model to estimate the time and costs involved. We investigated in detail how the planning process of skid trails is carried out in practice, what time is required for the planning work, and what factors influence its performance. Through an online survey conducted in 2022, we asked practitioners in Germany and Switzerland about their time and effort required for the planning process and the determining factors, such as the planning method and the terrain and stand conditions. Based on this survey, we calculated statistical indicators of time consumption, considered possible rationalization options, and developed an initial estimation model. The effort required to identify and evaluate skid trails planned for distances of 20 to 40 m amounts to around 3 to 4 hours of productive working time per hectare, with deviations expected depending on the specific situation in the forest. The costs corresponding to this investment amount to less than one euro per cubic meter of harvested timber, depending primarily on the extent of wood use. Our in-depth insight into the planning process enables its economic evaluation and the development of improvements.
Related Concept Videos
Design Example: Alignment of a Road Line Using GIS
Adjusting a Traverse
Manipulation and Analysis
Field Procedure for Staking Out Curves
Profile Leveling and Cross Sections
Design Example: Analyzing Capacity Contours for Flood Risk Assessment

