Related Experiment Video
Updated: May 28, 2025

Data Processing Methods for 3D Seismic Imaging of Subsurface Volcanoes: Applications to the Tarim Flood Basalt
Published on: August 7, 2017
Rising groundwater table due to restoration projects amplifies earthquake induced liquefaction risk in Beijing
Yuan Li1, Rui Wang2, Hongbo Ma1
1Department of Hydraulic Engineering, State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing, 100084, China.
Abstract:
Groundwater restoration is increasingly common to mitigate groundwater overexploitation, which proves effective in resolving urban water scarcity and regional unsustainable development. China's South-to-North Water Diversion Project is one of the largest water transfer projects to restore groundwater and resolve water shortage in Beijing. However, how the rapidly restored groundwater of this magnitude changes regional seismic stability is largely unknown. Here, we explore the relation between elevated groundwater table and seismic ground liquefaction based on the case of Beijing under the impact of the South-to-North Water Diversion Project. We collect groundwater table depth records and use them to drive three-dimensional geotechnical models that generate ground liquefaction hazard maps. We find a remarkable increase in coverage and severity of liquefaction due to groundwater table rise. Infrastructures built during the rapid urbanization process are often under low groundwater table and thus illy prepared for this increased seismic risk. These findings highlight the necessity to consider the seismic consequence of large-scale groundwater restoration projects.
More Related Videos
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Effect of Sea Water on Concrete
Concrete in areas between tide marks,...
Design Example: Maintaining Level of an Embankment
Responses to Drought and Flooding
Alkali Aggregate Reaction in Concrete
Unsoundness of Aggregate due to Volume Change

