Scheduling optimization based on particle swarm optimization algorithm in emergency management of long-distance

Huichao Guo1,2, Runhua Huang2,3, Shuqin Cheng2

  • 1School of Safety Science and Emergency Management, Wuhan University of Technology, Wuhan, Hubei, China.

Plos One
|February 10, 2025
PubMed

Related Concept Videos

Manipulation and Analysis01:21

Manipulation and Analysis

GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
18
Multiple Pipe Systems01:21

Multiple Pipe Systems

Multipipe systems consist of complex configurations of interconnected pipes designed to transport fluids efficiently across intricate networks. They are essential in engineering applications requiring precise control over flow distribution, pressure, and head loss. They are categorized into series, parallel, loop, and network configurations, each distinguished by unique flow characteristics and applications.
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
377
Applications of GIS: Disaster Management and Emergency Response01:29

Applications of GIS: Disaster Management and Emergency Response

Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
36
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
37
Pipe Flowrate Measurement: Problem Solving01:28

Pipe Flowrate Measurement: Problem Solving

A spray tank system is engineered to uniformly distribute a pest-control liquid across plants by using a pressurized mechanism. The tank, pressurized to 150 kPa, holds the pesticide at a height of 0.80 meters. Liquid flows from the tank through a 1.9 meter pipe with a diameter of 0.015 meters, angled at 0.698 radians, ultimately reaching a 0.007 meter nozzle that sprays the pesticide. Accurate calculation of the system's flow rate is crucial to ensure uniform application, and this is...
251