Abstract:
This article proposes a two-stage location model to construct a unified construction plan for multi-construction period material warehouses in the distribution network. Initially, we propose a honeycomb grid partitioning method aimed at managing the time-scale of electric power material demand through effective grid administration. Subsequently, we develop an optimization model for the first stage, which identifies the threshold for the upper limit of material transportation time and establishes the construction objectives for material warehousing during each construction period. To address the challenge posed by the inconsistent locations of material warehouses across different construction periods, we formulate an optimization model for the second stage. Finally, based on the spatial distribution of power demand in Taizhou City's distribution network, we devise a comprehensive construction plan for a material warehouse system that spans four construction periods. By adding nine material warehouse locations, we achieve a reduction of 57.14% in the maximum transportation time for electric power materials. The method proposed in this article provides a general solution for the long-term planning of persistent structures by converting long-term planning into construction goals across multiple stages.
Related Concept Videos
Design Example: Dimensioning of Concrete Masonry Construction
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
Design Example: Aggregate Gradation
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
Types of Building Separation Joints
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Distributed Loads: Problem Solving
Three Force Member
For example, consider a dumpster connected to a pin support at point A and a pin attached to a hydraulic cylinder at point B.