Research on accuracy enhancement methods for highway slope deformation monitoring based on the BeiDou system

Yuhong Luo1, Geyu Chen2

  • 1Dr., School of Civil Engineering, Chongqing Jiaotong University, Chongqing, China.

Plos One
|July 14, 2025
PubMed

Related Concept Videos

Distance Corrections01:15

Distance Corrections

To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
83
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
128
Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device01:30

Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device

Surveyors use Global Positioning System (GPS) technology to measure the precise location and elevation of points on Earth. In a recent survey, GPS receivers were used to determine the coordinates and elevations of two park monuments. The process involved careful mission planning, data collection, and correction to ensure accuracy. The survey began with mission planning to identify optimal satellite visibility and minimize Position Dilution of Precision (PDOP). A geodetic control point...
171
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
128
Beams with Unsymmetric Loadings01:17

Beams with Unsymmetric Loadings

Analyzing a supported beam under unsymmetrical loadings is essential in structural engineering to understand how beams respond to varied force distributions. This analysis involves calculating the deflection and identifying points where the slope of the beam is zero, which are crucial for ensuring structural stability and functionality.
The first moment-area theorem determines the slope at any point on the beam. This theorem indicates that the change in slope between two points on a beam...
168
Field Procedure for Staking Out Curves01:26

Field Procedure for Staking Out Curves

Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
152