A non-optically active lake salinity dataset by satellite remote sensing

Mingming Deng1,2, Ronghua Ma3,4, Lixin Wang5

  • 1Key Laboratory of Lake and Watershed Science for Water Security, Nanjing Institute of Geography and Limnology, Chinese Academy of Sciences, Nanjing, 210008, China.

Scientific Data
|July 30, 2025
PubMed
Abstract

Related Concept Videos

Determining the pH of Salt Solutions04:08

Determining the pH of Salt Solutions

The pH of a salt solution is determined by its component anions and cations. Salts that contain pH-neutral anions and the hydronium ion-producing cations form a solution with a pH less than 7. For example, in ammonium nitrate (NH4NO3) solution, NO3− ions do not react with water whereas NH4+ ions produce the hydronium ions resulting in the acidic solution.  In contrast, salts that contain pH-neutral cations and the hydroxide ion-producing anions form a solution with a pH greater than...
44.1K
Precipitation Gravimetry01:03

Precipitation Gravimetry

Precipitation gravimetry is based on converting an analyte into a sparingly soluble precipitate, which is separated by filtration and weighed. An ideal precipitate should be pure, insoluble, of known composition, and easily filtered from the reaction mixture.
In determining nickel by gravimetric analysis, a precipitant of ethanolic dimethylglyoxime is added to a hot nickel salt solution. This is quickly followed by the dropwise addition of dilute ammonia solution until precipitation occurs. A...
7.5K
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
121