Exploring the impact of emergency risk information on construction workers' emergency information behavior: insights

Hui Liu1, Rui Zhang1, Xiaodi Gao1

  • 1School of Emergency Science and Engineering, Jilin Jianzhu University, Changchun, China.

PubMed

Related Concept Videos

Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
371
The Availability Heuristic01:08

The Availability Heuristic

A heuristic is a general problem-solving framework (Tversky & Kahneman, 1974). You can think of these as mental shortcuts that are used to solve problems. Different types of heuristics are used in different types of situations, and the impulse to use a heuristic occurs when one of five conditions is met (Pratkanis, 1989):
6.9K
Applications of GIS: Disaster Management and Emergency Response01:29

Applications of GIS: Disaster Management and Emergency Response

Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
467
Hazard Rate01:11

Hazard Rate

The hazard rate, also known as the hazard function or failure rate, is a statistical measure used to describe the instantaneous rate at which an event occurs, given that the event has not yet happened. From a probabilistic perspective, it represents the likelihood that a subject will experience the event in a very small time interval, conditional on surviving up to the beginning of that interval. In terms of frequency, the hazard rate can be viewed as the ratio of the number of events to the...
401
Schemas01:42

Schemas

A schema is a mental construct consisting of a cluster or collection of related concepts (Bartlett, 1932). There are many different types of schemata, and they all have one thing in common: schemata are a method of organizing information that allows the brain to work more efficiently. When a schema is activated, the brain makes immediate assumptions about the person or object being observed.
12.3K
Bystander Effect02:09

Bystander Effect

The discussion of bullying highlights the problem of witnesses not intervening to help a victim. This is a common occurrence, as the following well-publicized event demonstrates. In 1964, in Queens, New York, a 19-year-old woman named Kitty Genovese was attacked by a person with a knife near the back entrance to her apartment building and again in the hallway inside her apartment building. When the attack occurred, she screamed for help numerous times and eventually died from her stab wounds.
10.2K