Abstract:
Blasting is essential for the efficient extraction of limestone. However, blast-induced ground vibrations raise environmental and safety concerns, particularly when mining activities are carried out near settlements, transportation networks, and other critical infrastructure. These vibrations not only pose risks to surface structures but also contribute to ground instability, dust emissions, and potential disturbances to nearby ecosystems. Regulatory restrictions often limit blasting operations in close proximity to sensitive areas, which can constrain resource utilization. It is difficult to obtain blasting permission from within 100 m of structures from regulatory bodies in India. This study reports controlled blasting techniques adopted at the Lanjiberna limestone and dolomite mine to mitigate adverse environmental impacts within 100 m of structures. Results shows that optimized blast design reduced peak particle velocity (PPV) about 30 to 40%, keeping vibration levels within regulatory limits. Overall, the controlled blasting trials at Lanjiberna mine highlight that environmentally sensitive blasting practices can minimize the impacts on surrounding ecosystems while ensuring safe, sustainable and elevated limestone extraction.
More Related Videos
11:14Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent
Published on: February 21, 2017
06:34Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner
Published on: October 25, 2017
Related Concept Videos
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Soundness of Cement